Female DC Connector 5.5mm X 2.1mm With 5 Ft Long Lead Wires For LED Strip Power Supplies And Remote

$3.05

Female DC Connector 5.5mm X 2.1mm With 5 Ft Long Lead Wires For LED Strip Power Supplies And Remote

SKU: 69-A18 Categories: ,

Description

Female DC Connector 5.5mm X 2.1mm With 5 Ft Long Lead Wires For LED Strip Power Supplies And Remote

Additional information

Weight 0.083 lbs
Dimensions 7.5 × 3 × 0.5 in

Reviews

There are no reviews yet.

Be the first to review “Female DC Connector 5.5mm X 2.1mm With 5 Ft Long Lead Wires For LED Strip Power Supplies And Remote”