Description
Female DC Connector 5.5mm X 2.1mm With 10 Ft Long Lead Wires For LED Strip Power Supplies And RemotE
$5.13
Female DC Connector 5.5mm X 2.1mm With 10 Ft Long Lead Wires For LED Strip Power Supplies And RemotE
Female DC Connector 5.5mm X 2.1mm With 10 Ft Long Lead Wires For LED Strip Power Supplies And RemotE
| Weight | 0.156 lbs |
|---|---|
| Dimensions | 10.25 × 3 × 0.5 in |
You must be logged in to post a review.
Reviews
There are no reviews yet.